We received the following note –
“My biggest challenge as a residential remodeler is obtaining and keeping qualified and experienced sub-contractors willing to do smaller type projects. The construction market here is so robust that selling a job is relatively easy but producing the job seems almost impossible. Talk about some tips to deal with this situation.”
Good question.
Subcontractor Manual
General contractors, get expections in writing. Fully customizable, edit to match company policies.
Order it Here
It should be clear to your subs that if they want the “big jobs”, they must be willing to do the little stuff as well. If they aren’t willing to come out for a small job, find a new sub for your bigger jobs. When you do call them for small jobs, then you must be willing to pay a minimum trip charge. I was figuring a minimum trip charge of at least $150 twenty years ago. I don’t know what the going rate is today.
But how do you attract subs willing to do both the big and the small jobs? Be sure you have an agreement that you use for ALL subcontractors. (Check out ours at our website.) An agreement lays the groundwork for your relationship so you both know what to expect from the other, and it’s a commitment that makes both of you more apt to work through the tough times. The agreement must have two parts.
The first part is broad, and covers all potential jobs with the sub. Include what you expect from them such as a firm price quotation for each job, showing up on the agreed upon time, keeping the job site clean, no loud radios, no drugs, smoking, or alcoholic drinks, no talking with the customers, etc.
You must include a statement that it is up to the sub-contractor to provide proof of required licenses, bonds and insurance, and proof of financial competency. Without either, they will not be allowed to set foot on your jobs.
It also states everything that they can expect from you. Include exactly how and when you will pay them, and what will stop you from paying them. For example, if a job is not being kept clean, or if they aren’t doing a specific job as agreed. This should also layout what you mean by “being on time” and what is a legitimate reason for them not showing up as agreed.
You must also specify that you do not allow Cost Plus or T & M quotes for work to be done. Fixed figure quotes on all work other than minor changes should be the rule.
Finally, you should specify how written or verbal changes are to be made, how verbal invoices are to be handled and any penalties or bonuses that will be included. Remember, penalties and bonuses must work both ways.
The second part of the agreement is a form you use on each job. Specify exactly what you want done, and have a place for them to quote a price for that work. Now, there are no disagreements over what is or was to be done and by whom. This eliminates the “extras or changes” that can crop up.
You will quickly find that if you agree to pay every two weeks on your jobs, you will attract the best subs. The last thing subs need is a general contractor telling them, “I can’t pay you until I have been paid.” That approach is not only dishonest, it’s dumb as well. Don’t do it.
When you pay your subs, it should be by company check only. Never, Never, Never pay any sub or any labor with cash. Company checks have your company name, your business address and a number on that check. No exceptions. Paying subs or labor by cash is just asking for a visit from either the state or federal auditors, and is unethical.
Now, if you ask a sub to do design work of any kind, you should be willing to pay for that service. If you use their designs and don’t pay, then go to another sub because they are cheaper, there is something seriously wrong with your way of doing business. Don’t do it.
What else can you do? As above, paying on time is a big one. This will go a long way in getting and keeping good subs working for you.
Always be fair. If a situation comes up that is not in your sub-contractor agreement, err on the side of fairness to the sub. Remember, they have families and a business to take care of just like you do. Trying to chisel a sub out of a dime is going to cost you dollars in the long run. Many general contractor’s never figure that one out, and wonder why they can’t find and keep good subs.
Here is an idea that I used almost from the start of my career in sales in 1969. If I asked a sub to give me a quote on a job, and they did, if I got the job, they got the job. I didn’t shop them around; I didn’t get three bids on each job. If they helped me put an estimate and proposal together, they got the work. I had many of my subs that went back 5, 10, 15 years and more with me. My roofer went back over 30 years.
Once a job was quoted, I expected the price to hold for that job. But my subs knew me well enough to know that they could come and tell me about price increases at any time. If they needed to quote a higher price for the next job based on a legitimate price increase, that was okay. I never fussed at them over prices. It is a fact of life that if their price goes up, yours goes up. Now if a sub started running the price of their work up for unnecessary reasons, I made sure I knew my numbers well enough that I could call them on it. Running prices up just to try and get more money out of me got them a one-way pass out of the relationship.
Using a subcontractor manual will help to eliminate the bad subs even before they show up as they will know they can’t perform and they will just go away.
The knowledge and experience Michael Stone gained in his 60+ years in construction has helped thousands of contractors improve their businesses and their lives. He is the author of the books Markup & Profit Revisited, Profitable Sales, and Estimating Construction Profitably, and is available for one-on-one consultations.